BV Operational Training Center Police Headquarters Westhessen
Ginsheim-Gustavsburg
The new police training center can accommodate up to 120 police officers every day for training purposes. The building consists of a flat-roofed structure in solid reinforced concrete construction and comprises a first floor and three upper floors. With a total height of around 16.75 meters, which rises to around 20.85 meters in the area of the roof structures, the center has an impressive presence. The gross floor area (GFA) of the new building totals around 10,000 square meters.
The entire construction is made of concrete. The foundation consists of a watertight construction. All reinforced concrete parts are executed with very high surface requirements (SB3). Prestressing steel was used in the ceilings. Due to the large span width of the ceilings and the increased requirement for deflection, the majority of the ceiling is designed as a prestressed concrete ceiling.
Location
Ginsheim-Gustavsburg
Construction segment
Public facility
Services
Earthworks, shoring, drainage channels, shell construction, concrete work, precast reinforced concrete elements
Completion date
December 2024
BV Data centre
New construction of a data centre for a well-known customer
BV Data centre
BV fire station and residential building
Public facility and residential complex
BV fire station and residential building
BV Sludge digestion plant
Sludge digestion plant with sludge aeration
BV Sludge digestion plant
BV Grossmarkthalle
New construction of a wholesale business for food and catering supplies